Hello Guiyang Nanming engineering monitoring Co., Ltd.

News

Business

Contact

Guiyang Nanming engineering monitoring Co., Ltd.

Contact: Rao manager 13908512762

Seat machine: 085186822621

Fax: 085186825987

Mailbox: nmgcjc@vip.163.com

Web site: www.nmgcjc.com

Address: No. 109, Zhonghua North Road, Yunyan District, Guiyang, Guizhou (No. 1802 of Zhongxia building)


The state energy bureau issued the " hydropower station dam operation safety information submitted to the measures"

Your current position: Home >> News >> company

The state energy bureau issued the " hydropower station dam operation safety information submitted to the measures"

Date:2017-09-06 Author: Click:

Each sent energy regulatory agencies, dam center, the relevant power enterprises:

In order to implement the " hydropower station dam operation safety supervision and management regulations" ( the national development and reform commission order No. twenty - third ), strengthen the hydropower station dam off-site safety supervision and management, standardize the dam operation safety information submitted to the behavior, I formulated the " hydropower station dam operation safety information submitted to the measures". Are hereby printed and distributed to you, please follow.

national energy board

26 September 2016

Measures for the submission of safety information for dam operation of hydropower stations

Chapter I general rules

Article 1 these measures are formulated in accordance with the provisions on the supervision and administration of dam operation safety of hydropower stations ( order no 23 of the state development and reform commission ) in order to strengthen the supervision and administration of off-site safety of hydropower stations ( hereinafter referred to as the dam ) and regulate the reporting of dam operation safety information.

Article 2 the submission of dam operation safety information shall be timely, accurate and complete. The submission, management and use of information shall comply with the relevant confidentiality requirements of the state.

Article 3 these measures shall apply to the submission, use and supervision and administration of safety information on the operation of dams registered and filed in the state energy administration.

Article 4 the electric power enterprise is the main responsibility for dam operation safety information submitted, should be clear dam operation safety information submitted to the responsible departments and responsible person, establish and improve the dam operation safety information submitted to the system, to carry out dam operation safety information construction, in accordance with the requirements submitted to the dam operation safety information.

For the new operation of the dam, the electric power enterprise shall declare the dam registration or apply for dam safety registration from the date of submission of information.

Article 5 the state energy bureau shall be responsible for the comprehensive supervision and administration of the safety information submitted to the national dam operation. The agency shall be responsible for urging the electric power enterprises within the jurisdiction of the dam operation safety information submitted and information construction work.

Dam center is responsible for the construction and operation of the national dam operation safety supervision and management information system, supervision and guidance of electric power enterprise dam operation safety information submitted and information construction work, analysis and processing of electric power enterprises submitted to the dam operation safety information, judge the dam operation safety situation.

Chapter ii contents and requirements for submission

Sixth dam operation safety information is divided into three categories of daily information, annual report, special report.

Seventh daily information including dam safety monitoring information, dam flood and disaster, dam anomalies and dam operation accident.

( a ) dam safety monitoring information

For dam height of more than 70 meters, storage capacity of more than 100 million cubic meters of dam, engineering safety is particularly important dam and dam, power enterprises should be collected dam safety monitoring information within 48 hours automatically submitted to the dam center. Other dam safety monitoring information, electric power enterprises should be submitted to the dam center before the 15th of the next month.

Dam safety monitoring information submitted to the project and the basic monitoring frequency table see annex.

( b ) dam flood

Into the flood season, the electric power enterprise shall, in accordance with the provisions of the water administrative department of the standard and the flood period, submit the dam flood to the dam center. Dam flood generally includes reservoir surface rainfall ( or near the dam site rainfall ), reservoir water level, storage flow, outbound flow, waste water flow, flood discharge, etc.

Flood may pose a threat to the safety of dam operation, electric power enterprises shall promptly report to the higher authorities, the relevant agencies, the relevant departments of the local government.

( c ) dam disaster

Magnitude of 5 and above and the source from the dam site within 100 km of the earthquake, and the impact of debris flow, landslides, landslides and other disasters occurred, the power enterprise shall within 1 hour to the higher authorities, the relevant agencies and the dam center, the relevant departments of the local government report disaster news, report the details of the disaster within 12 hours.

( 4 ) abnormal situation of the dam

The abnormal situation of the dam, the electric power enterprise shall report to the higher authorities, the relevant agencies and the dam center within 24 hours.

( five ) the dam operation accident

Dam operation accident, electric power enterprises should be within 1 hours of the higher authorities, the relevant agencies and dam center, the relevant departments of the local government report.

Agencies and dam center, the national electric power safety production Committee enterprise member units received the dam operation safety impact of flood, disaster, dam operation accident report, should be within 1 hour of the state energy bureau report.

Eighth annual report is divided into dam safety annual detailed investigation report, dam safety registration self-examination report and annual report of dam safety work.

The electric power enterprise shall submit the annual report to the dam center before February 15 of the following year.

Article 9 special reports include special reports on dam reinforcement and renovation of dam safety monitoring system. Dam reinforcement project report includes: dam reinforcement design report, review report, construction report, completion acceptance report. Dam safety monitoring system renovation project report includes: dam safety monitoring system renovation design report, review report, installation and commissioning and commissioning report, completion acceptance report.

After the completion of the dam reinforcement acceptance, or the dam safety monitoring system renovation after the completion of the acceptance, the electric power enterprise shall within 1 months will be submitted to the corresponding special report to the dam center.

Chapter iii analysis and use of information

Tenth dam center shall promptly analyze and deal with the daily information submitted by the electric power enterprises. Found that the abnormal situation, the dam center shall, within 24 hours of power enterprises and relevant units put forward suggestions, and notify the relevant agencies.

Article 11 the dam center shall timely judge the dam flood, disaster, abnormal situation and operation accident information submitted by the electric power enterprises, and provide corresponding technical support for the dam operation safety emergency management.

Article 12 the dam center in carrying out regular inspection of dam safety, should make full use of the electric power enterprises submitted to the dam operation safety information and daily monitoring results, for the dam operation and working state evaluation provides an important basis.

Article 13 the dam center shall, in accordance with the annual report submitted by the electric power enterprise and the dam safety supervision and management work carried out, submit the annual report of the national dam safety work to the state energy bureau.

Chapter iv supervision and administration

Fourteenth dam center shall report every quarter of the power enterprise dam operation safety information submitted and information construction.

Fifteenth dam center shall, in conjunction with the agency of the power enterprise dam operation safety information submitted to the work and information construction supervision and inspection.

Article 16 for not in accordance with the present measures to carry out dam operation safety information submitted to the work or provide false information, conceal important facts of the electric power enterprises, by the relevant agencies in accordance with the provisions of the hydropower station dam operation safety supervision and management of article 37 and article 38 for processing.

Chapter v supplementary rules

Seventeenth the meaning of the following terms:

( a ) dam anomalies, refers to the phenomenon of deviation from the normal change trend in the operation process of the dam, such as: cracks in the dam body or the development of the original cracks; Freezing and thawing, frost heave, corrosion or over-current parts of the building appear serious cavitation erosion, wear and erosion; Dam surface dislocation; Dam body or slope deformation mutation; Foundation or dam uplift pressure, leakage, leakage water quality changes; Important parts of the stress, strain and other monitoring items measured sudden change; Monitoring system important projects can not be normal monitoring, etc.

( 2 ) the dam operation accident refers to the situation that occurs during the operation of the dam and leads to serious consequences, such as dam failure, serious structural fracture and collapse; Flood overtopping, flooding; Serious damage to flood discharge structures; Large volume collapse of dam slope; Near the dam bank and slope mass slump, etc.

Eighteenth dam safety monitoring information is divided into two categories of general projects and important projects.

The general project is the basic monitoring project in the process of dam operation as stipulated in the technical specification for monitoring.

The important project is the monitoring project determined according to the actual operation characteristics and working behavior of the dam, aiming at the important parts and weak links of the dam. For important projects, should implement automatic monitoring, and ensure the normal work of the relevant facilities 24 hours a day, so that the dam management unit and the dam center can remotely collect data at any time; Can not use automatic monitoring, should be in accordance with the monitoring frequency requirements in a timely manner will be manually measured values into the database, so that the dam management unit and the dam center can timely and remote access to data.

Article 19 the dam center shall, in accordance with these measures, formulate relevant supporting documents such as safety information submission and information construction technical requirements for dam operation of electric power enterprises.

Article 20 these measures shall come into force as of the date of promulgation. The original state electricity regulatory commission " hydropower station dam operation safety information submitted to the measures" ( electricity safety 2006 No. 38 ) shall be repealed at the same time.

 

Url:http://en.nmgcjc.com/news/345.html

Tag:水电站大坝监测

Browse:

Share 一键分享
Welcome to leave message
Please input the message here, we will contact you as soon as possible.
Name
Name
Phone
Phone
Email
Email
Adress
Adress